4.1.12.2 Environmental Requirements for Device Operation
4.1.12.2.1 Environmental Requirements for Equipment Room
Requirements for Selecting a Site for Equipment Room
When designing a project, consider the communication network planning and
technical requirements of the equipment. Also consider hydrographic, geological,
seismic, power supply, and transportation factors.
Construction, structure, heating and ventilation, power supply, lighting and re-
proof
construction of the equipment room should be designed by specialized
construction designers to suit the environmental requirements of devices. The
equipment room should also follow local regulations concerning the industrial
construction, environmental protection,
re safety, and civil air defense.
Construction must conform to government standards, regulations, and other
requirements.
The equipment room should be located in a place free from high temperature,
dust, toxic gases, explosive materials, or unstable voltage. Keep the equipment
room away from
signicant vibrations or loud noises, as well as power transformer
stations.
The specic requirements for selecting a site for an equipment room are as
follows: