EasyManua.ls Logo

Huawei NetEngine 8000 F

Huawei NetEngine 8000 F
729 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 4-216 Flowchart for installing a cabinet on a concrete oor
Pre-installation Check
Precautions
Take the following precautions before the installation:
Be careful not to damage components and cables in the cabinet during
transportation.
If the cabinet surface is scratched, paint the scratched area with the same
painting as the other part to protect the cabinet.
Conduct a comprehensive inspection on the cabinet before the installation. If
you
nd the cabinet distorted or its surfaces damaged, contact technical
support personnel immediately.
Follow the installation instructions provided in this document and make
adjustments according to actual situations in your installation site.
HUAWEI NetEngine 8000 F
Hardware Guide 4 Hardware Installation and Parts Replacement
Issue 05 (2023-03-31) Copyright © Huawei Technologies Co., Ltd. 556

Table of Contents

Related product manuals