Figure 5-9 Placing the UPS and batteries
For tower-mounted installation, you are advised to place batteries on the left side of the
UPSs, as shown in the gure.
Step 3 Install rubber plugs.
Figure 5-10 Installing rubber plugs
----End
UPS2000-H-(6 kVA-10 kVA)
User Manual 5 Installation and Cable Connection
Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd. 63