Figure 5-32 Installing AC power cables
(1) Short-circuit copper bar
● Three-phase input single-phase output
Figure 5-33 Installing AC power cables
Step 4 Install the top cover from the connection box.
Figure 5-34 Installing the top cover from the connection box
----End
UPS2000-H-(6 kVA-10 kVA)
User Manual 5 Installation and Cable Connection
Issue 03 (2023-08-20) Copyright © Huawei Digital Power Technologies Co., Ltd. 73