v 1.0 — February 2020 Altanium Matrix5
162 Change the Zone Shown on the History Plot Screen
12.2.4 Change the Zone Shown on the History Plot Screen
To change a zone shown on the History Plot screen, do the steps that follow:
1. On the History Plot screen, touch the Variable Selection button of the zone or process
to be changed. Refer to Figure 12-3.
The Process History Variable Selector dialog window shows. Refer to Figure 12-5.
2. Touch the Minimize/Maximize buttons to navigate to the selection you want.
3. Touch the heat zone or process you want to see.
4. Touch the Accept button.
Figure 12-5 Process History Variable Selector Dialog Window
1. Minimize/Maximize Buttons