EasyManua.ls Logo

Inventec N800G3 - Power Distribution Board; To Remove the Power Distribution Board

Default Icon
258 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hardware Operations
2015-MNU-000023
2-7
2.5 Power Distribution Board
The location of power distribution boards is shown below:
Figure 2-11 Power Distribution Board Location
Reminder
Before you remove or install the power distribution board, please follow the steps below:
Step 1:
Make sure the server is not turned on or connected to the AC power. To power off
the server, see “2.1.1 Power Off”.
Step 2:
Remove the chassis cover. To remove the chassis cover, see
“2.2 Chassis
Cover”.
Step 3:
Remove the power supply. To remove the power supply, see “2.4 Power
Supplies”.
Step 4:
Disconnect all the necessary cables.
2.5.1 To remove the power distribution board
Loosen the four screws that secure the power distribution board.
Lift the top power distribution board out of the chassis.
Figure 2-12 Removing the Power Distribution Board

Table of Contents

Related product manuals