CHAPTER 5
Preparation Overview
QFX5110 Site Preparation Checklist on page 43
QFX5110 Environmental Requirements and Specifications on page 44
General Site Guidelines on page 45
Site Electrical Wiring Guidelines on page 46
Virtual Chassis Fabric Hardware Overview on page 47
Planning a Virtual Chassis Deployment using QFX Devices on page 48
Planning a Virtual Chassis Fabric Deployment on page 51
QFX5110 Rack Requirements on page 53
QFX5110 Clearance Requirements for Airflow and Hardware Maintenance on page 55
QFX5110 Site Preparation Checklist
The checklist in Table 18 on page 43 summarizes the tasks you need to perform when
preparing a site for a QFX5110 installation.
Table 18: Site Preparation Checklist
DatePerformed ByFor More InformationItem or Task
Architecture
Virtual Chassis Fabric Hardware
Overview on page 47
Planning a Virtual Chassis Fabric
Deployment on page 51
Determine whether the QFX5110 device will
operate:
standalone
as a member in a Virtual Chassis
as a spine or leaf in a Virtual Chassis Fabric
(VCF)
Environment
“QFX5110 Environmental
Requirements and Specifications”
on page 44
Verify that environmental factors such as
temperature and humidity do not exceed switch
tolerances.
Power
Measure the distance between external power
sources and switch installation site.
43Copyright © 2017, Juniper Networks, Inc.