Table 33: Inventory of Components Supplied with a QFX5110 (continued)
QuantityComponent
2Extension brackets
1RJ-45 cable and RJ-45 to DB-9 adapter
Related
Documentation
Mounting a QFX5110 in a Rack on page 77•
• Installing and Connecting a QFX5110 on page 75
Mounting a QFX5110 in a Rack
You can mount a QFX5110 on a four-post 19-in. rack using the mounting kit provided with
the switch. This kit contains two front-mounting rails with two matching rear-mounting
blades. This configuration allows either end of the switch to be mounted flush with the
rack and still be adjustable for racks with different depths.
Space the front and rear rack rails between 28 in. (71.1 cm) and 36 in. (91.4 cm)
front-to-back.
This topic describes:
•
Before You Begin Rack Installation on page 77
•
Procedure on page 78
Before You Begin Rack Installation
Before you begin mounting a QFX5110 switch in the rack:
1. Ensure that you understand how to prevent electrostatic discharge (ESD) damage.
See “Prevention of Electrostatic Discharge Damage” on page 182.
2. Verify that the site meets the requirements described in “QFX5110 Site Preparation
Checklist” on page 43.
3. Place the rack in its permanent location, allowing adequate clearance for airflow and
maintenance, and secure it to the building structure.
4. Read “General Site Guidelines” on page 45, with particular attention to “QFX5110
Chassis Lifting Guidelines” on page 162.
5. Remove the switch from the shipping carton (see “Unpacking a QFX5110” on page 76).
6. Ensure that you have the following parts and tools available to mount the switch in
a rack:
77Copyright © 2017, Juniper Networks, Inc.
Chapter 9: Unpacking and Mounting the Switch