EasyManua.ls Logo

KEM MKC-710 - Replacement of Pump Tube

KEM MKC-710
133 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. Maintenance
92
7-2-5.Replacement of pump tube
Initial pump flow rate is about 20mL/10 sec at the fastest, which may be reduced when
the tube is used for a long time. This may result in leakage of samples at the time of
measurement.
Follow the instructions below.
1) Remove the tubes connected to
cassette.
2) Remove the pump tube cap, as
shown on the right.
3) Remove the pump tube, as shown on
the right.
Nut
Cap
Tube

Table of Contents

Related product manuals