A
Axis, agitator
B
Screw conveyor axis
C
Rotational direction
D
Centre, agitator
Sizing the horizontal discharge AH with agitator and discharge screw conveyor
a Min. length of protective panel for bunker walls
b Sealed channel
c Open conveyor channel downstream of agitator centre
d Open conveyor channel upstream of agitator centre max. 2.8 m
e Wall clearance to centre
f Discharge circuit from 3.9 to 6.1 m depending on bunker situation
g Effective scope 0.8 to 0.95 x f
Depending on: fuel, installation position, compression, etc.
Design information
(cont.)
56
PYROT
6
5822 516 GB