EasyManua.ls Logo

Lanmage 6600C - Chapter 4 Installation and Debugging Instructions; Installation Instructions; Construction Requirements of Machine Room

Default Icon
101 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6600 Product manual
Operator Manual
18
Chapter 4 Installation and debugging instructions
4.1 Installation instructions
4.1.1 Construction requirements of machine room
1. Machine room area requirement
Room size requirement recommended by inspection room
Length * width * height =5000×5000×3000mmminimum size4500×4000×2700mm
Room size requirement recommended in operation room
Length * width * height =3000×2500×3000mmminimum size2000×2000×2700mm
Room net height recommended size≥3000mmDoor net height 2000mmDoor net
width 1400mm (minimum size: room net height ≥ 2800mm, door net width 1200mm)
below the minimum size will affect equipment installation
2. Equipment room protection requirements: Please follow the local health inspection and
quarantine department standards for construction, the following is for reference only.
The six-sided wall or floor of the inspection room needs to reach the equivalent of 2
mm of lead equivalent (concrete thickness should be ≥ 150mm).
The lead glass thickness of the inspection room and the operation room is 2 mm.
The recommended lead glass size is: length * width * thickness = 1200 * 800 * 20mm,
and the height of the lead glass is 900mm from the ground.
3. Equipment operating environment requirements:
Temperature requirement 10 40 It is recommended to have one air
conditioner with 2 powers.)。
Relative humidity: 30% to 75% (one must be equipped with an automatic
dehumidifier in wet areas)
4. Ground bearing requirements of the equipment room:
Please read the following carefully: If the floor of the equipment installation is not the

Table of Contents