EasyManua.ls Logo

Lanmage 6600C - Preparation before Installation; Installation Instructions

Default Icon
101 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6600 Product manual
Operator Manual
20
the copper core wire the indoor power supply box can be connected to the ground
terminal block.
ā—† Check the indoor installation of 3 220V power outlets, control the indoor computer
desk under the location of the installation of 220V power outlets 5, the technician
control room must have the external network conditions, and install the network port
socket.
4.1.2 Preparation before installation
1. Tools and equipment needed: a variety of screwdriver (a set), a variety of metric
and imperial wrench, a spirit level, electric knives, a skinning pliers, a cutting pliers, a
needle nose pliers, a flat nose pliers, a hammers, drills, quasi-straight, tape measure, ruler
(18 inches or longer), multimeter, hydraulic forklift and so on.
2. Check to make sure the power supply, ground floor, temperature and humidity of
the machine room meet the requirements and installation configuration conditions.
3. Unpacking according to the state of the box.
4. Check and confirm whether the product received is intact.
4.1.3 Installation Instructions
4.1.3.1 General Installation Process
The Medical X ray high frequency high voltage generator consists of control software
(version V1) and DR high voltage generator mainframe.
The DR high voltage generator main frame consistent closure, PCBA assembly, Rectifier
assembly, resonant assembly and Tank.

Table of Contents