EasyManua.ls Logo

LogTag TRIX-8 - Manufacturing Phase 2: Product Assembly & Test

LogTag TRIX-8
53 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LogTag TRIX-8/TRIX-16 Work Instruction Manual Revision 9.20 Page 22/53
2. MANUFACTURING PHASE 2
The following manufacturing steps are undertaken to power up and test product to a state ready for
labelling and shipping.
2.1 Apply foam dot to underside of battery
Items Required
Battery
Self Adhesive foam dot
Procedure
Remove backing from one side of foam dot to expose adhesive and apply foam dot to ‘+’ side (bottom)
of battery

Table of Contents

Other manuals for LogTag TRIX-8

Related product manuals