EasyManua.ls Logo

Lucent 5ESS DRM - Page 593

Default Icon
642 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 –– Fully operational.
7 –– Aborting.
y = Process run state.
0 –– Running.
1 –– Step done.
zz = Error code:
21 Initialization timeout
hh hh hh = Hardware status digits. Refer to Figure A2-1 for definition
of the digits.
A2.2.7.5 Explanation
AIM prints this PRM to report that it was unable to successfully complete an essential
process full process initialization (FPI). The FPI, also known as an S5 initialization,
failed because of a timeout.
AIM will select a recovery action based on the severity of the problem, the state of the
system, and the extent of previous recovery attempts. If the problem persists (recovery
thresholds are exceeded), and AM software checks are allowed, AIM will trigger a
high-level AM initialization. Otherwise, no initialization will occur. However, the
system may not support essential functionality (such as call processing, maintenance,
or input/output).
A2.2.7.6 Corrective Action
If several minutes elapse without recovery or escalation to higher levels of
initialization, see “Analyze AM Initialization Failure,” 235-105-250, 5ESS Switch
System Recovery Manual.
A2.2.8 PRM:VE FF1F-B
A2.2.8.1 PRM Format
PRM_p vEda FF1F wwww xyzz hh hh hh
A2.2.8.2 PRM Source
Application Integrity Monitor (AIM) Phase Trigger.
A2.2.8.3 Function
UNIX RTR operating system application process Full Process Initialization (FPI)
request.
A2.2.8.4 PRM Expansion
235-200-150
January 2003
APPENDIX 2
PROCESSOR RECOVERY MESSAGES
Issue 3.00 Page A2-17

Table of Contents