OPERATION
Attaching the Header (continued)
9. Start engine. Activate header tift cylinders
(switch
on
ground
speed
lever)
to
raise
header
fully. Stop engine and remove key.
10.
A
DANGER: To avoid bodily injury
from
fall
of
raised header, always
engage header
lift
cylinder
stops
(A) when working on
or
around
raised header.
11
. Attach float
sp
rings to front of linkag
e,
both
sides. Secure with "L" pin
(8)
and hair pin.
12.
Install
pin
(C) through header
leg,
(engaging
U-brack
et
in lift linkage), both sides.
910,
920
,
932
&
942
Headers: Secure L-pin
behind lug (D).
960
Header: Rotate L-pin
to
align
roll
pin
with
key
slot for installation
and
removal.
Roll
pin
locks inside to secure the position.
962 Header: Secure 8" clevis pin with lynch pin.
970 Header: Secure 6%" clevis pin with lynch
pin.
38
ENGAGE LIFT CYLINDER STDPS
ATTACH FLOAT SPRINGS
AUGER & MULTI-CROP DRAPER HEADER
INSTALL PINS THRO
UGH
LEGS