Maintenance work on the carrier
7.11 Suspension
7 - 82 3 302 756 en Maintenance manual
GMK6400
16.11.2018
7.11.4 Pressure accumulator – checking the gas pressure
The gas pressure must be checked every 3,000 operating hours, but always
at least every 12 months.
The suspension has integrated, nitrogen-filled
pressure accumulators (1).
The filling pressure at 20 °C (68 °F) is 40 bar
(580 psi).
• Have the filling pressure checked, and if
necessary corrected, by
Manitowoc Crane Care
or an authorised GROVE dealer or an
authorised specialist workshop.
M 12
G
Risk of accidents due to incorrect inspection!
The gas pressure test must be carried out only by an authorised official
inspector of pressure tanks or under his/her supervision or instructions.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK6400 and is the answer not in the manual?

Manitowoc GROVE GMK6400 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK6400
CategoryConstruction Equipment
LanguageEnglish

Related product manuals