EasyManua.ls Logo

Manitowoc GROVE GMK6400

Manitowoc GROVE GMK6400
354 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance work on the superstructure
8.8 Main boom
8 - 70 3 302 756 en Maintenance manual
GMK6400
16.11.2018
8.8.3 Checking the sheaves
Check all sheaves (1) and (2) for damage,
wear, mobility and heavy soiling.
Have damaged, worn, stiff or extremely soiled sheaves replaced by
Manitowoc Crane Care or an authorised GROVE dealer or your repair crew.
8.8.4 Checking the locking system
Have the main boom locking system checked regularly by
Manitowoc Crane Care or an authorised GROVE dealer.
M 3
M 12
G
Risk of accidents if maintenance work is not carried out!
Have the maintenance work on the main boom locking system performed
regularly by
Manitowoc Crane Care or an authorised GROVE dealer.
This prevents the complete unlocking of a telescopic section in Emergency
operation/Emergency program mode, which could cause serious accidents
and damage to the truck crane.

Table of Contents

Related product manuals