Maintenance work on the superstructure
8.3 Hoists
8 - 16 3 302 756 en Maintenance manual
GMK6400
16.11.2018
8.3.6 Having a partial inspection carried out
Only suitably trained specialists should carry out a partial inspection of:
The multiple-disk brake
The plug connections between the hydraulic motor and the multiple-disk
brake
The plug connections between the multiple-disk brake and transmission
unit
And be permitted to exchange parts with signs of wear.
8.3.7 Having a general inspection carried out
H
When carrying out the general inspection of the hoists, also observe the in-
formation contained in Measures required for monitoring the winches, p. 5 - 21.
The general inspection involves removing the transmission and sending it
to the manufacturer to be examined.
H
For transmissions that have undergone a general overhaul, a first oil change
must be carried out after 200 and 1,000 operating hours;
à There are regu-
lations regarding running in individual parts that must be followed, after:, p. 4 - 1.
Y 3
Y 6