Maintenance work on the superstructure
8.10 Cable drums and slewing angle sensor
8 - 86 3 302 756 en Maintenance manual
GMK6400
16.11.2018
tt
Maintenance of
the slip ring
assemblies
• Remove the cap (1) or (2).
• Clean and dry the cap.
• Replace the gasket if necessary.
• Only use a cloth and compressed air to
remove any dirt on the slip rings (2).
• Do not use spray oil.
• Check to make sure all screws (1) are tight.
• Attach the cap to the cable drum.
S
Risk of damage to the RCL!
Before maintenance work on the slip ring assemblies, always switch off the
battery master switch so that the cable drum is without power.
This prevents short circuits which may lead to damage to the rated capacity
limiter (RCL).
G
Risk of crushing from movement of the main boom!
Perform maintenance work only after the truck crane has been shut down.
Always ensure that the truck crane is protected from unauthorised use be
-
fore beginning maintenance work. Remove the keys from the crane cab and
put up warning signs.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK6400 and is the answer not in the manual?

Manitowoc GROVE GMK6400 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK6400
CategoryConstruction Equipment
LanguageEnglish

Related product manuals