Maintenance overview
5.2 Maintenance plans
16.11.2018
Maintenance manual 3 302 756 en 5 - 5
GMK6400
Maintenance work on the SUPERSTRUCTURE:
Daily/before putting into operation
Pump transfer case
– Checking the oil filter à p. 8 - 35
Hydraulic system
– Checking the oil level à p. 8 - 43
Hoist ropes
– Checking the winding à p. 8 - 71
Electrical system
– Checking the lighting and indicators à p. 8 - 95