Maintenance overview
5.2 Maintenance plans
16.11.2018
Maintenance manual 3 302 756 en 5 - 9
GMK6400
Maintenance work on the SUPERSTRUCTURE:
Monthly / after 100 oper. hrs.
Pump transfer case
– Checking the oil level à p. 8 - 36
Main boom
– Greasing the piston rod of the derricking cylinder à p. 8 - 65
Air-conditioning system
– Checking the air conditioning system à p. 8 - 97
Other maintenance work
– Checking the functioning of the auxiliary heater à p. 8 - 101