Maintenance overview
5.2 Maintenance plans
16.11.2018
Maintenance manual 3 302 756 en 5 - 13
GMK6400
Maintenance work on the SUPERSTRUCTURE:
Every six months / after 500 oper. hrs.
Slewing gear
– Checking the slewing gear brake à p. 8 - 18
Slewing bearing
– Lubricating the gear teeth à p. 8 - 27
– General inspection à p. 8 - 29
– Measuring tilting play à p. 8 - 30
Cable drums and slewing angle sensor
– Maintenance of the slip ring assemblies à p. 8 - 85
Air-conditioning system
– Checking hoses à p. 8 - 97