Maintenance overview
5.2 Maintenance plans
16.11.2018
Maintenance manual 3 302 756 en 5 - 17
GMK6400
5.2.9 Maintenance plan Y 5
5.2.10 Maintenance plan Y 6
Y 5
Maintenance work on the CARRIER:
Every 60 months / 100,000 km (62,000mi)
– Have the Cardan shaft between the transmission on the engine and the trans-
fer case replaced by Manitowoc Crane Care or an authorised GROVE dealer.
– Have the two drive shafts between the engine and the hydraulic pumps
replaced by
Manitowoc Crane Care or an authorised GROVE dealer.
Maintenance work on the SUPERSTRUCTURE:
Every 60 months / after 5,000 oper. hrs.
Cable drums and slewing angle sensor
– Lubricating the slewing angle sensor à p. 8 - 87
Y 6
Maintenance work on the CARRIER:
every 72 months
No maintenance work in this period.
The longer-term intervals always include the shorter-term intervals!
Maintenance work on the SUPERSTRUCTURE:
Every 72 months / after 6,000 oper. hrs.
Hoists
– Having a general inspection carried out à p. 8 - 16

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK6400 and is the answer not in the manual?

Manitowoc GROVE GMK6400 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK6400
CategoryConstruction Equipment
LanguageEnglish

Related product manuals