Manitowoc Published 08-06-19, Control # 237-09_v2 4-25
MLC165-1 OPERATOR MANUAL SETUP AND INSTALLATION
14. Swing the upperworks 180° (Figure 4-24).
15. Install the second crawler in the same manner the first
crawler was installed.
Repeat Install First Crawler
step 1 through step 13 until
the second crawler is on the ground.
16. Go to Finish Installing Crawlers on page 4-27
.