EasyManua.ls Logo

Medica EasyStat - Page 56

Medica EasyStat
158 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
50
o p e r a t i n g t h e a n a l y z e r
s
Install the new pump tubing.
Push the two middle collars completely into the back of the slots on the
pump shelf.
Press YES to REPLACEMENT COMPLETED? Reagents are
automatically primed from the reagent module. When priming is com-
plete, the display indicates the detection of each fluid with PASS,
then automatically returns to the REPLACE COMPONENTS
screen.
Pump Tubing
Replace the pump tubing every six months, or earlier if the pump
tubing appears worn or flattened. Select PUMP TUBING. Fluid
is automatically purged from the sample flow path. When the purge
cycle is complete, proceed with pump tubing replacement.
Remove the pump tubing.

Table of Contents