MM098-002 – LOGOS ONE – Operator Manual
91
AFTER THE 3 MINUTES WITHOUT POWER, WITH UPS
The system automatically puts the specimens rack in “Safe mode”, according to the following schedule:
POWER FAILURE
PROCEDURE
PHASE1
POWER FAILURE
PROCEDURE
PHASE2
POWER FAILURE
PROCEDURE
PHASE3
Fixation
Flushing
Rinsing1/2
Dehydration
Clearing
Wax
Cleaning
MAIN CAVITY
Fixation
Flushing
Rinsing1/2
Dehydration
Clearing
Wax
Cleaning WAX
Flushing
Rinsing1/2
Dehydration
Clearing
IF NEXT PHASE
EXISTS AND IS
NOT WAX
IF NEXT PHASE
EXISTS AND IS
WAX AVAILABLE
IF NEXT PHASE
EXISTS AND IS
WAX NOT
AVAILABLE
FINISH
UNLOADING
FINISH
UNLOADING
FINISH
UNLOADING
LOADING NEXT
REAGENT
LOADING WAX IN
MAIN CAVITY
RELOADING
SAME REAGENT
Since WAX cannot be melted in “Power failure procedure”, operator is required to wait till
the completion of WAX remaining heating time, before removing the specimens.
In case of power failure during the WAX impregnation in MAIN CAVITY or in WAX CAVITY,
the rack cannot be unloaded until the WAX heating time is completed (by default 100
minutes melting time). The specimens are safe anyway in the solid WAX, so there is no
risk of damage if they are not removed.
In case of power failure during the transfer of WAX between the two cavities, it is
impossible to start a new process until the WAX heating time is completed (by default 100
minutes melting time).