EasyManua.ls Logo

Milestone UltraGROSS - Unpacking and Check List

Milestone UltraGROSS
168 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
UltraGROSS
32
2.4. Unpacking and check list
Upon opening the crate, check to make sure that all the parts are present.
1X Wastewater pipe, internal Ø 40mm with 2 metal straps 5m long.
2X Fume discharge pipes internal Ø 160mm length 4m with 2 metal straps.
2X Ducts for passive hood only for letter P.
1X Anemometer only for letter P.
1X Pressure switch only for letter P.
1X Fixative loading pedal. Only for letter F- 2X if double letter F in code.

Table of Contents

Related product manuals