EasyManua.ls Logo

Mitsubishi 6M70 - Surge Tank Disassembly and Assembly

Mitsubishi 6M70
364 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14-24
Disassembly sequence
1 Supply hose
2 Air bleeder hose
3 Overflow hose
4 Supply pipe
5 Supply hose
6 Pressure cap
7 Water level sensor
8 O-ring
9 Surge tank
: Non-reusable parts
Assembly sequence
Follow the disassembly sequence in re-
verse.
Service standards (Unit: mm)
Tightening torque (Unit: N·m {kgf·m})
Inspection procedure
Inspection: Pressure cap
(1) Pressure valve opening pressure
If the measurement deviates from the standard value, replace
the pressure cap.
Location Maintenance item Standard value Limit Remedy
6 Pressure valve opening pressure
49 ± 9.8 kPa
{0.5 ± 0.1 kgf/cm
2
)
–Replace
Mark Parts to be tightened Tightening torque Remarks
Clamp 3 to 5 {0.3 to 0.5}
Water level sensor 3 to 4 {0.3 to 0.4}
SURGE TANK

Table of Contents

Related product manuals