15-50
Disassembly sequence
Assembly sequence
Follow the disassembly sequence in reverse.
Tightening torque (Unit: N·m {kgf·m})
Mark Parts to be tightened Tightening torque Remarks
Bolt (intake manifold mounting)
54 {5.5} –
Bolt (air inlet pipe mounting)
Bolt (bracket mounting)
Nut (air inlet pipe mounting)
Eyebolt 21 {2.1} –
Bolt (boost pressure sensor mounting) 4 to 6 {0.4 to 0.6} –
Intake air temperature sensor 1 20 {2.0} –
Intake air temperature sensor 2 25
± 5 {2.5 ± 0.5} –
1 Eyebolt
2 Boost pressure sensor
3 Intake air temperature sensor
4 Intake air temperature sensor
(dummy)
5 Bracket
6 Air inlet pipe
7 Gasket
8 Spacer
9 Gasket
10 Intake manifold
11 Gasket
*
a: Cylinder head (See Gr11.)
: Non-reusable parts
M
ITSUBISHI 6M70 INTAKE MANIFOLD