Setup Cha
ter Two: Installation
26
Volta
e Selector
Switch
Fuses
Figure 2: Voltage and Fuse Data for the High Power Unit
The 651 pressure controller is now ready for valve connection and system setup. Refer to
Chapter Three: Overview
, page 27, for an overview of the controller and to
Chapter Four:
System Setup
, page 39, for instructions on how to setup and operate the unit.