Section 75 00-02-0878
2013-03-07 - 174 -
Select test type to simple
Block the operation of the genset breaker.
Power management: Four different applications can
be stored at the same time in the units. Here the
selection between them can be made.
Run all mains in application
Broadcast the common settings to all units.
Start the engine and close the breaker/open the
breaker and stop engine.
Disables the base load function.
Forces this unit to have the first priority in a power
management system.
Selects to measure AC voltage on a 3-phase system.
Select split L1 L3 phase system
Selects to measure AC voltage on a 2-phase system.
Select split L1 L2-phase system
Selects to measure AC voltage on a 2-phase system.
Select single phase system
Selects to measure AC voltage on a 1-phase system.
Idle speed constant low speed.
Idle speed temperature-dependent.
Interrupt cool down sequence.
Activate all AOP-2 buzzers
Activate all AOP-2 relays
Activate relay on
AOP-2 ID1
Activate relay on
AOP-2 ID2
Activate relay on
AOP-2 ID3
Activate relay on
AOP-2 ID4