EasyManua.ls Logo

Olympus OER-Pro - Page 70

Olympus OER-Pro
308 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
64
Chapter 3 Inspection Before Use
ENDOSCOPE REPROCESSOR OER-Pro Operation Manual
1. After starting the endoscope reprocessing or disinfection of the water supply
piping, firmly pinch the test strip end (opposite side of the reaction zone)
with the test strip forceps. Pull the test strip gently to make sure it is properly
pinched.
Figure 3.28
2. When the disinfectant solution is supplied to the basin, “D” of the process
step indicators and the disinfectant solution heating indicator on the main
control panel blinks.
Figure 3.29
In the case of disinfecting the water supply piping, when the reprocessing basin
is filled with disinfectant solution, three buzzer beeps are generated and the
TIME/CODE display on the main control panel blinks. (State described at
sentence 9 in Section 7.3, “Disinfecting the water supply piping” on page 202.)
Reaction zone

Table of Contents

Related product manuals