EasyManuals Logo

Oracle SPARC T8-2 User Manual

Oracle SPARC T8-2
188 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #141 background imageLoading...
Page #141 background image
Install the Fan Board
Install the Fan Board
This is a cold-service procedure that must be performed by qualified service personnel. Power
down the server completely before performing this procedure.
Caution - This procedure requires that you handle components that are sensitive to ESD which
can cause server components to fail.
1.
Take the necessary ESD precautions.
See “Prevent ESD Damage” on page 55.
2.
Using the fan board cable and power cables from the faulty fan board, plug the
cables into the corresponding connectors on the replacement fan board.
Servicing the Fan Board 141

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle SPARC T8-2 and is the answer not in the manual?

Oracle SPARC T8-2 Specifications

General IconGeneral
BrandOracle
ModelSPARC T8-2
CategoryServer
LanguageEnglish

Related product manuals