10 | iProductionManager
84 / 188 Original instructions for use
1. In the iProductionManager, select the ticket to be copied and drag it to a rack
level.
2. Press this button: after selecting the ticket again.
1. You can now select a rack level to which the ticket is to be copied.
2. Press this button: to confirm your selection.
10.7 Target time cooking
In the iProductionManager, you can plan the dishes so that the dishes start
cooking at the same time or dishes are finished at the same time. You can carry
out this planning either at the current time or in the future. To do this, position