Press Start/Stop.
The metering slide of the previously selected section opens and the calibration is started.
The calibration can be stopped at any time by pressing the ESC key. The metering slide is closed
and the display shows the Fertiliser settings menu.
The calibration time is not relevant to the accuracy of the results. However, a minimum of 20 kg
should be calibrated.
u
Press Start/Stop again.
The calibration is completed.
The metering slide closes.
The third calibration page is displayed.
WARNING!
Risk of injury due to rotating machine parts
Any contact with rotating machine parts (drive shaft, hubs) may lead to bruises, abrasions, and
crushing injuries. Body parts or objects may be caught or drawn in.
Switch off the tractor engine.
Switch off the hydraulics system and secure it against unauthorized activation.
4. Operation
QUANTRON-A AXIS/MDS 5902662
51

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rauch QUANTRON and is the answer not in the manual?

Rauch QUANTRON Specifications

General IconGeneral
BrandRauch
ModelQUANTRON
CategoryControl Unit
LanguageEnglish

Related product manuals