EasyManua.ls Logo

Roche 9180 - Page 185

Roche 9180
186 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roche Diagnostics
Instructions for Use · Version 10.0 185
9180 Electrolyte Analyzer Index
– Installation and deinstallation, 20
– Instrument damage, 24
– Mechanical safety, 22
– Operating conditions, 20
– Operator qualification, 19
– Reagents and working solutions, 22
– Safe and proper use of the system, 19
– Software and data security, 23
Sample collection, 99
– Acceptable anticoagulants, 100
– Safety, 99
– Safety requirements, 99
Sample collection containers, 100
– Capillary tubes, 100
– Syringes, 100
Sample handling, 101
– Aqueous solutions, 102
– Plasma, 101
– Serum, 101
Sample throughput, 43
Sample types, 43
Sample volumes, 43
Screenshot disclaimer, 2
Selecting parameter configuration, 91
Semi-annual maintenance, 140
Setting date and time, 87
Shutdown, 92
– Installing shutdown plug, 92
– Installing the relief clamps and removing the pump
windings, 95
– Installing the transport housing, 93
– Removing the electrodes and the shutdown plug, 94
– Turning the analyzer "off", 96
– Washing the lines, 94
Sodium electrode, 57
Software
– version, 2
Specifications of the solutions, 173
Standby mode, 32
Start-up, 86
Symbols
– Symbols used in the publication, 7
– Symbols used on consumables, 9
– Symbols used on the instrument, 8
Syringe, 100
T
Troubleshooting, 155
– Deleting data, 166
– Clearing all data, 166
– Clearing sample count, 166
– Error messages, 155
– Service codes, 164
– Entering service codes, 164
– List of service codes, 165
– Removing service codes, 164
– Service functions, 159
– Status LEDs, 163
– Testing the amplifier, 162
– Testing the electrodes, 159
– Testing the interface, 162
– Testing the language switch, 161
– Testing the pump, 162
– Testing the sample door, 161
– Testing the sample sensor, 160
– Testing the SnapPak sensor, 160
– Testing the valves, 162
Turning the analyzer "off", 96
U
Unscheduled maintenance, 142
W
Washing the lines, 94
Weekly maintenance, 135
What is new in publication version 8.0, 13
– Harmonization of reference ranges and removal of
critical values, 13
– New approvals, 13
– New consumable information, 13
– Revised name plate, 13
– What is new in publication version, 13

Table of Contents