Roche Diagnostics
82 Instructions for Use · Version 10.0
6 Installation and shutdown 9180 Electrolyte Analyzer
Installation
o Unscrew the red transport housing from the reference electrode and check that
the o-ring on the electrode is properly seated. Rinse, dry and save the transport
housing for storage of the reference electrode in the event the analyzer is turned
off or taken out of service for any reason.
Figure 6-3
o Carefully screw the reference electrode into the reference electrode housing and
place it with the other electrodes.
Figure 6-4
o Slide the measuring chamber forward until it locks into the forward position.
o Unclamp the left electrode holder by moving the clamp forward.
Figure 6-5
A Reference electrode housing
B Reference electrode
C Red transport housing
BA
C