Roche Diagnostics
84 Instructions for Use · Version 10.0
6 Installation and shutdown 9180 Electrolyte Analyzer
Installation
o After all electrodes have been installed, close the clamp on the left electrode
holder by lifting it upward until it locks into the back position, and ensure that the
electrodes are properly seated.
Figure 6-8
o Slide the measuring chamber back until it snaps into position.
Figure 6-9
o Plug the tubing connector of the reference housing assembly in the receptacle
below the left side of the measuring chamber.
Figure 6-10