d04919.fm
INSTALLATION MANUAL
BRP-Powertrain
Effectivity: 912 Series
Edition 2/Rev. 0
10-10-00
page 14
August 01/2012
3) Preparations for trial run of engine
General note
3.1) Conduct test run
Instruction See Operators Manual 912 chapter. 3.
3.2) Verification of the throttle lever detent for max. continuous power:
Instruction Performance check in accordance with Operators Manual.
If nominal performance won‘t be reached or is in excess of, examination of
the installation and engine will be necessary.
WARNUNG
WARNING
Non-compliance can result in serious injuries or death!
Prior to engine start and operation review all instruc-
tions stated in the Operators Manual.
WARNUNG
NOTICE
Don‘t conduct any test flights before fault has been
traced and found.