EasyManuals Logo

Rotax 912 Series Installation Manual

Rotax 912 Series
199 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #42 background imageLoading...
Page #42 background image
d04919.fm
INSTALLATION MANUAL
BRP-Powertrain
Effectivity: 912 Series
Edition 2/Rev. 0
10-10-00
page 14
August 01/2012
3) Preparations for trial run of engine
General note
3.1) Conduct test run
Instruction See Operators Manual 912 chapter. 3.
3.2) Verification of the throttle lever detent for max. continuous power:
Instruction Performance check in accordance with Operators Manual.
If nominal performance won‘t be reached or is in excess of, examination of
the installation and engine will be necessary.
WARNUNG
WARNING
Non-compliance can result in serious injuries or death!
Prior to engine start and operation review all instruc-
tions stated in the Operators Manual.
WARNUNG
NOTICE
Don‘t conduct any test flights before fault has been
traced and found.

Table of Contents

Other manuals for Rotax 912 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rotax 912 Series and is the answer not in the manual?

Rotax 912 Series Specifications

General IconGeneral
Redline5800 rpm
TBO2000 hours
Displacement1211 cc
Bore79.5 mm
Stroke61 mm
Power Output80 hp (59.6 kW)
Compression Ratio9.0:1
Fuel TypeAvgas 100LL
Ignition SystemDual electronic ignition
Fuel SystemFuel Injected
Oil SystemDry sump
Engine Type4-cylinder, horizontally opposed, 4-stroke

Related product manuals