BRP-Rotax
MAINTENANCE MANUAL
Step
Procedure
4 Insert 2 6x20 dowel pins into the crankcase.
5
Apply KLUEBER ISOFLEX TOPAS into the needle bearing and lubricate
the crankshaft with LOCTITE Anti Seize.
Figure 5.8
1
Dowel pins 6x20
ATTENTION
If excessive installation force is used, the bearing or vacuum pump gear can be
damaged.
Step
Procedure
6
Check the overload clutch for correctly installation. Observe the mark.
05–50–00
Page 10
December 01 2017
Effectivity: 915 i A Series
Edition 0/Rev. 0