EasyManua.ls Logo

Satec BFM 136 - Real Time Clock Setting; Basic Device Settings

Satec BFM 136
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3 BFM136 Graphical Display Operations Menu Operations
Branch Feeder Monitor 136_Installation Operation and Manual 32
3.5.3 Real Time Clock Setting
This menu allows you to adjust internal real time clock.
To enter the menu, select the RTC entry from the main menu, and then press the ENTER button.
To adjust the clock:
1. Highlight a time or date item you want to change item by briefly pressing the SELECT button.
2. Adjust the selected item with the UP/DOWN buttons.
3. Highlight the next item you want to change and adjust it in the same manner.
4. To store your new date and time, press the ENTER button. If you confirm the time change while
the seconds item is highlighted, the seconds’ reading will be zeroed, otherwise seconds stay
unchanged.
To exit the menu, highlight the menu name (upper-left item) with the SELECT button, and then press the
ENTER button.
3.5.4 Basic Device Settings
This menu allows you to define the general characteristics of the electrical network.
To enter the menu, select the Basic entry from the main menu, and then press the ENTER button. For
instructions on navigating in the menu, see Viewing and Changing Setup Items.
The following table lists available options.
Label
Parameter
Options
Default
Description
Pt
PT Ratio
1.0-6500.0
1.0
The phase potential transformer’s primary to
secondary ratio
Frequency
Nominal frequency
50, 60 Hz
60 Hz
The nominal power frequency
PowDmdPer
Block power demand
period
1, 2, 5, 10, 15,
20, 30, 60 min
30
The length of the demand period for power
demand calculations
Num.Per.
The number of blocks
in the sliding window
1-15
1
The number of blocks to be averaged for
sliding window demands
VDmnPer.
Volt demand period
0-9000 sec
900
The length of the demand period for volt
demand calculations
ADmdPer.
Ampere demand
period
0-9000 sec
900
The length of the demand period for ampere
demand calculations
RTC Jun 06,2005
Time 20:47:06
SELECT
RTC Jun 06,2005
Time 20:47:06
RTC Jun 06,2006
Time 20:47:06
ENTER
RTC Jun 06,2006
Time 20:47:06
Basic Exit
Basic Frequency
60
ENTER

Table of Contents

Related product manuals