Chapter 2 Installation Electrical I N S T A L L A T I O N
PM130 PLUS Powermeter Series 25
Voltage Input connection
The equipment installation shall conform to the
following instructions:
a) a switch or circuit-breaker shall be included in the
building installation;
b) It shall be in close proximity to the equipment and
within easy reach of the OPERATOR;
c) It shall be marked as the disconnecting device for
the equipment.
Before installing, ensure that all incoming power
sources are shut OFF. Failure to observe this practice
can result in serious or even fatal injury and damage
to equipment.
690V Inputs (Standard)
690V inputs are usually used with direct connection. Use any of the seven
wiring configurations shown in Figures 2-8 through 2-15.
120V Inputs (Option U)
120V inputs usually imply use of a potential transformer (PT). The PT
requires use of any of the four wiring configurations shown in Figures 2-7
through 2-10.
Current Input Connection
The PM130 does not have current terminals.
Using internal CT, the PM130 PLUS does not have current terminals
Using external CT (HACS High Accuracy SATEC Current Sensor),
the PM130 PLUS provides current terminals
V
1
V
2
V
N
V
3
V
1
V
2
V
3
Voltages
690V Input (Standard)
690
690
690
400
400
400
V
1
V
2
V
N
V
3
V
1
V
2
V
3
Voltages
120V Input (Option U)
120
120
120
120
120
120

Table of Contents

Other manuals for Satec PM130E

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Satec PM130E and is the answer not in the manual?

Satec PM130E Specifications

General IconGeneral
BrandSatec
ModelPM130E
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals