EasyManuals Logo

Schaerer Coffee Joy Programming Manual

Schaerer Coffee Joy
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
www.schaerer.com Programming
30 / 56
Programming manual (Customer Program) / V03/05.2012
Additional functions
The following menu item appears when you press the right mouse button in the "System con-
guration" window.
Grinding performance test (grinder calibration)
The grinding performance needs to be redefined after the grinding discs are changed. The
grinder must be in its basic setting and must be installed in the machine (see Service Manual).
Empty the grounds container and dry it well.
Rell the beans.
Pressing the coffee bean [ Test ] button starts the calibration process. The coffee is ground for
3x 10 seconds.
Weigh the ground coffee.
Enter the determined value under "Powder amount in gram".
Press the [ Set ] button to store the value.
The value is calculated automatically and entered under "Grinding performance" on the "Pa-
rameters" tab in the "System configuration" menu.
"Grinder calibration" menu

Table of Contents

Other manuals for Schaerer Coffee Joy

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Schaerer Coffee Joy and is the answer not in the manual?

Schaerer Coffee Joy Specifications

General IconGeneral
Bean hopper capacity500 g
Water tank capacity2.5 l
Pump pressure15 bar
TypeAutomatic Coffee Machine
Power supply220-240 V, 50-60 Hz

Related product manuals