EasyManua.ls Logo

SCOTT Scotty 5000 - Machine Timing

SCOTT Scotty 5000
254 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Maintenance
4--8
F--9999--8 Build 8 Issue 1
4.1.3 Machine Timing
Proper timing must exist to obtain acceptable machine operation. Operation of machine while out of time will
result In unacceptable production and may result In machine damage and/or personal Injury. Disturbances to
the timing of the machine requires completion of the following timing adjustment procedures:
Feeder Timing
Plastic Feed and Cut Timing
Machine Cycle Timing
Note ! Fig. 4-9. and Fig. 4-10. provide views of the front and rear sections of the machine.
Fig. 4-11. is a view of the drive chain connection. All figures within this section can be
easily located on the machine by referring to the appropriate view and/or drive chain for
component location.
PAPER
SUPPORT
PAPER
CATCHER
OPERATORS
PANEL
PILE
FEEDER
TIP DIE
TAB
CUTTER
ELECTRICAL
BOX
PAPER LIFT
HANDWHEEL
PLASTIC
POSITION
HANDWHEEL
PLASTIC SIZE
HANDWHEEL
TAB POSITION
HANDWHEEL
TAB SIZE
HANDWHEEL
Fig. 4 -9. Machine Front View

Table of Contents