3 Operation
3--13
F--9999--8 Build 8 Issue 1
3.3 Preliminary Inspection and Start-Up Procedure
VALVE
CONTROL
Fig. 3-21. Air Valve Control
3.3.1 Preliminary Set-Up
Step: 1. SlidethevalvecontroluptotheON
position.
MAIN
POWER
SWITCH
Fig. 3-22. Circuit Breaker Switch (ON)
Step: 2. Main Power Switch ON.
HEATER
Fig. 3-23. Warm Up Heater
To laminate plastic to paper:
Step: 3. Press HEATER pushbutton.
Step: 4. Set temperature controllers to
220--230_F as a starting point.
Note ! Starting Heaters now will allow
heaters to reach operating
temperature while the rest of the
machine is being set up.