4 Maintenance
4--10
F--9999--8 Build 8 Issue 1
4.1.4 Preparation for Timing Procedures
PLASTIC
FEED/TIP DIE
SPROCKET
CHAIN
TAKE -UP
MAIN DRIVE
SPROCKET
TIMING
CHAIN
PILE FEEDER
DRIVE SPROCKET
Fig. 4-11. Timing Chain Connections
BEFORE ATTEMPTING TIMING
PROCEDURES, DISCONNECT POWER
FROM MACHINE AT THE SOURCE
CONNECTION AND LOCKOUT/TAGOUT
THE POWER SWITCH (REFER TO
SAFETY TAGS). FAILURE TO COMPLY
CAN RESULT IN SERIOUS BODILY
INJURY OR DEATH FROM ELECTRIC
SHOCK OR UNEXPECTED MACHINE
MOVEMENT.
CAUTION!