2 Installation
2--5
F--9999--8 Build 8 Issue 1
2.1.2 Uncrating & Placement
The machine will arrive crated. Inspect the external condition of the crate for visible signs of damage before
opening. If damage is noticeable, notify the carrier or Scott before proceeding with the installation.
VACUUM
UNIT
PLASTIC
POSITION
HANDWHEEL
SHIPPING
SKID
MAIN
MACHINE
RAISE FROM
THIS SIDE
OF SKID
Fig. 2-3. Scotty 5000 on Shipping Skid
Step: 1. Remove shrink wrap enclosing the machine.
REMOVE SUPPORT BOARD BEFORE
PROCEEDING FUTHER. CARE MUST
BE TAKEN WHEN MOVING THE
MACHINE SO AS NOT TO DAMAGE IT.
CAUTION!
EXTREME CAUTION MUST BE
EXERCISED WHEN MOVING MACHINE
TO INSTALLATION LOCATION TO
PREVENT DAMAGE.
CAUTION!
Step: 2. With fork lift, place shipping skid near designated floor area of operation.
Step: 3. Remove vacuum unit from skid.
Step: 4. Remove four lag screws holding machine to shipping skid.
Step: 5. Raise main machine with fork lift, remove shipping skid assembly from under machine.
Step: 6. Lower main machine to floor.