14
14.2 Installation and Connection
188 Digital Fault Recorder, SIMEAS R-PMU, Manual
E50417-H1076-C360-A5, Release 10.2012
14.2 Installation and Connection
Notes
• The prescribed sequence of operations must be considered and observed when
commissioning the SIMEAS R-PMU.
• Adjustment of the individual data acquisition units at the site is not necessary for the
SIMEAS R-PMU because the device has already been adjusted in the factory.
• For initial delivery, the SIMEAS R-PMU is equipped with the ordered components.
Depending on how communication with a PC or DAKON is planned, the corresponding
interface must be parameterized and put into service.
• If components are installed subsequently in the SIMEAS R-PMU, the respective installation
instructions can be found in Chapter 14.3. After the components have been connected, the
parameters are set for the system.
• To ensure proper functioning, all parameterizations steps described in Chapter 12 must be
carried out.
• The basic parameters are set by default before the SIMEAS R-PMU is delivered. The
following chapters describe the procedure for commissioning the SIMEAS R-PMU.
CAUTION
Caution about wrong transport, storage, installation and mounting of the device.
Nonobservance of the safety instructions means that moderately severe or slight injuries
can occur.
• The trouble-free and safe use of this device depends on proper transport, storage,
installation and mounting of the device taking into account the warnings and instructions in
this manual.
• In particular, the general mounting and safety regulations (e. g. IEC, DIN, VDE, EN or other
national and international standards) for work with power current equipment must be
observed.