8.16 VPM V oltage Protection Module
8-326
© Siemens AG 2008 All Rights Reserved
SIMODRIVE 611 Configuration Manual (PJU) -- 05/2008 Edition
S Connection of internal cable routing and VPM 200 Dynamik
VS1
U1
U2
V1
V2
U3
U4
VS2
W1
PE1
X3
W2
PE2
W3
PE3
W4
PE4
VS4
VS3
VS1 +
K1
VS2 +
K2
K3 +
K4 +
VS3
VS4
S Attaching the four cable glands
S Strip cable to approx. 300 mm, based on the
cable glands you are using, and expose the
shield connection
S Apply the cable lug
S Connect the cables to X3 and secure them
with the cable tie (see Fig. 8-45)
S Insert K1 and K2 into VS1 and VS2 and pull
taught, making sure that the black cable (L1)
and the protective cable are on top.
S Connect the individual cables in the following
order:
-- K1 blue (L2) ⇒ V1
-- K2 blue (L2) ⇒ V1
-- K2 green/yellow (PE) ⇒ PE1
-- K1 brown (L3) ⇒ W2
-- K2 black (L1) ⇒ U2
S For the time being, do not connect the
remaining three cables
S Insert K3 and K4 into VS3 and VS4 and pull
tight, making sure that the black cable (L1)
and the protective cable are on top.
S Connect the individual cables in the following
order:
-- K3 blue (L2) ⇒ V2
-- K4 blue (L2) ⇒ V2
-- K3 brown (L3) ⇒ W3
-- K4 green/yellow (PE) ⇒ PE4
-- K4 black (L1) ⇒ U3
-- K1 black (L1) ⇒ U4
-- K3 black (L1) ⇒ U1
-- K2 brown (L3) ⇒ W4
-- K4 brown (L3) ⇒ W1
-- K3 green/yellow (PE) ⇒ PE3
-- K1 green/yellow (PE) ⇒ PE2
Wiring sequence
Where:
K1: Cable 1 (from the converter)
K2: Cable 2 (from the converter)
K3: Cable 3 (from the motor)
K4: Cable 4 (from the motor)
VS1 to VS4: Cable glands 1 to 4
U1 to U4: Terminal studs 1 to 4, phase U
V1 and V2: Terminal studs 1 and 2, phase V
W1 to W4: Terminal studs 1 to 4, phase W
PE1 to PE4: Terminal studs 1 to 4, busbar PE
U: Busbar, phase U
V: Busbar , phase V
W: Busbar, phase W
PE: Busbar PE
Fig. 8-43 Connection of internal cable routing and VPM 200 Dynamik