Installation
7.3 Connecting SITOP BAT1600 battery modules to the UPS module
SITOP UPS1600 / BAT1600 / UPS1100
214 Equipment Manual, 07.2021, A5E37775406-11-76
Power terminals
Communication terminals
Commissioning the SITOP BAT1600 battery module
Figure 7-3 Commissioning
1. When supplied, LiFePO4 batteries are internally disconnected and therefore must first be
connected.
2. Insert fuse .
3. For 3.2 Ah and 12 Ah devices: Move the fuse cover over the fuse until it latches into place.
4. Connect power and communication connectors to the SITOP UPS1600. Carefully
check that the wiring polarity is correct!
5. Plug-in the connector at the battery module and commission the system.
After approximately 5 s battery module SITOP BAT1600 is detected by the SITOP UPS1600.